Read #3. Uh Oh. No MBs??? Big sigh, I'm riding anyway. Wish me luck.
ST LOUIS - The public is invited to join in the celebration of the completion of the west half of the I-64 project this Sunday, December 14. MoDOT and City of Frontenac officials will hold a ribbon-cutting ceremony on the Lindbergh bridge over I-64 at 12:30 p.m. on Sunday. The official west half celebration ribbon cutting will be held at 2:30 p.m. on the eastbound lanes of I-64 near the McCutcheon Road bridge.
Several organized events are being held on the westbound lanes including a 5K run, a cycling time trial and a fun bike ride. These events required pre-registration and all slots have been filled. ONLY registered participants will be allowed to access the westbound lanes for the run or cycling events.
If you plan on attending the celebration, dress for the weather and keep in mind the following tips:
1. The Fun starts at noon on Sunday, December 14 and continues to 3 p.m.
2. You can get on the Eastbound lanes of the highway, at any entrance ramp or exit ramp between Ballas Road and Brentwood Boulevard.
3. You can walk, ride a bike or rollerblade on the highway, but no motorized vehicles will be allowed. If you ride a bike and you are in a crowded area, you will need to walk your bike through the crowd.