SAWEEEET!!!!
I have been working feverishly to get my chopper done. I'm down to the brackets for the custom disk brakes for the Stingray wheels, the custom 3 watt led old school bullet headlight, led turn signal, led brake & tail electrical system with a rechargeable 3.6v Nimh battery charged by the engine's magneto converted to 4.6 volt dc output, and then it's running the brake, clutch & throttle cables along with the shifter cable for the rear five speed derailer. Once I fire it up for the first time, hopefully real soon, and work out the bugs, then I can finally paint on the "ratrod" flat black, red rims & white wall tires paint scheme. I've been taking pedal trips around the block. The suspension works great and the bike handles like a bmx. Lovin' the 14" ape hangers as well.
I have 29 days before the run, so I had better get a move on....
Wow, 21 so far.....that is just excellent.
'BrettMavriK