Duck, Duck, Mongoose.

I have finally settled on my next bike. It's a steel frame Mongoose Creekside. This bikes sole purpose will be speed and R&D. I've had this bike for some time and have already replaced all the bearings with sealed cartridges in the headset and bottom bracket. It had brand new everything as I had just rebuilt the bike before I stumbled upon this motorized bicycle craze.
This bike is going to be the recipient of the Dio Reed Sleeved Stroker Engine I'm building. The Jack shaft kit has been ordered along with another Oko carb. The rear rack is going and the seat is getting lowered and pulled back.
Going get rid of the suspension forks and go with a set of 30" triple trees forks with clip on bars. I'm still undecided about the gas tank but I'm sure I'll think of something and change my mind 10 times long before then. This build isnt in a rush to finish as I still have really never finished the Rambler yet and need to finish up the lighting system I have for it. And im also getting married for the first time in October and I have lots to do before the wedding. I will however keep the build updated as it progresses.
20190731_215831.jpg
20190731_215939.jpg
20190627_195056.jpg
20190731_220138.jpg
20190731_220226.jpg

20190731_220158.jpg
20190731_220215.jpg
20190731_220226.jpg
 

Attachments

  • 20190731_220143.jpg
    20190731_220143.jpg
    272.8 KB · Views: 405
God Damn that is nice as f***. Put a axle tug on the right side cause your gonna need it.
Hey Gary I'm curious if you've had to replace the shift cables on the nuvinci hub? Looks to be pretty straight forward. The cables that came with my hub are frayed and to short and the wrong color lol. I guess this is where I should probably read the manual hahaha
 
Well the wedding is over and I've officially been married for just about 2 weeks now.
The bike is starting to come together. I need to weld on some caliper brackets and mount the brakes and install brake and shifter and clutch cables. I also need to hide the wiring for the lights and make a box to hide the batteries and fuse panel and flashers and other electrical gear. And I need to make a new stinger for the pipe and reroute it in a different direction. Then tear it all down and paint before final assembly.
Now that the wedding is over I will have alot more time to dedicate to building this bike and then redoing the Rambler before spring.
The nitrous kit arrived last month as well however I don't think it will be tested until this engine gets a few runs in.
Here are a few pics of my progress. Nothing is really final yet.
View attachment 91210View attachment 91211View attachment 91212View attachment 91213View attachment 91214View attachment 91215View attachment 91216View attachment 91217

 
its been awhile but i am 95% finished the bike. i have a few little things to do like mount and install the dash cam and im waiting for a mount for my nitrous and my axle tugs, both should be here tomorrow or monday. after that it will just be a matter of waiting for a decent dry day to taake it out for a test run. also im waiting for my tach wich should also be here in the next few days. im probably going to start anew thread with all the final specs but heres a sneak peek at the new build.

20191226_155341.jpg
20191226_160139.jpg
20191226_160100.jpg
20191226_160035.jpg
20191226_155953.jpg
20191226_155945.jpg
20191226_155925.jpg
20191226_155818.jpg
20191226_155810.jpg
20191226_155808.jpg
20191226_155703.jpg
20191226_155550.jpg
20191226_155542.jpg
20191226_155531.jpg
20191226_155456.jpg
 
Back
Top