KyleManeti95
New Member
- Local time
- 7:33 PM
- Joined
- Nov 29, 2022
- Messages
- 18
Kind of, I want to build a custom bike from the ground up that I will be mechanically sound to safely travel at 80mph speeds so I’ve been designing custom parts for that project. And I’m thinking I could possibly make those available for the public at reasonable prices, great quality and good customer service. Bike parts will be my main focus but I’ll be more of a job shop until I get to the point where I have a fully equipped shop todo all of the work in house.
I’m working on my business plan at the moment, I’m going to do everything in stages, that way I can slowly add more capabilities in my shop. Stage 1 will be 3d printing, growing my farm to 6 printers. Stage 2 is still 3d printing with some basic machining capabilities, I’ll still be adding a printer once every three months or so. I’m planning on having 12 standard size printers and 2 large format printers on the farm, during the later part of stage 2, I will be adding a manual mill and lathe. These will most likely be medium sized machines as the next stage starts with a move to a bigger shop where I can start investing in cnc equipment, welding, plasma cutting etc. Stage 3 will last about a year or so, in which time I will add more machines, and start acquiring/making all the various tooling I’ll need for production of frames, hubs or any odd random job that comes my way
I’m working on my business plan at the moment, I’m going to do everything in stages, that way I can slowly add more capabilities in my shop. Stage 1 will be 3d printing, growing my farm to 6 printers. Stage 2 is still 3d printing with some basic machining capabilities, I’ll still be adding a printer once every three months or so. I’m planning on having 12 standard size printers and 2 large format printers on the farm, during the later part of stage 2, I will be adding a manual mill and lathe. These will most likely be medium sized machines as the next stage starts with a move to a bigger shop where I can start investing in cnc equipment, welding, plasma cutting etc. Stage 3 will last about a year or so, in which time I will add more machines, and start acquiring/making all the various tooling I’ll need for production of frames, hubs or any odd random job that comes my way