From conception to complete fully tested and perfection of all the faults of functionality & dependability 3 months First was sprocket integrity noting to spokes was never considered do the torque this 212cc fully built power plant was capable of even a cnd hub mounted sprocket mount couldn't hold and twisted and let loose severing 9 of 32 spokes so as the pictures show it was mounted to the axel mount for the wheel next issue the trike kits cant handle the torque of the bog block 4 cycles so chop up some handlebars to beef up the rear end and toss the u bolts for the motor mount plate in the trash and welded it directly to the frame also welded a front mount for the rear end to the bike frame that's held by 2 bolts so the rear can still be removed
Attachments
-
20191016_130246.jpg153.2 KB · Views: 868
-
20191016_130302.jpg136 KB · Views: 368
-
20191016_130325.jpg120.2 KB · Views: 401
-
20191016_130342.jpg147.2 KB · Views: 367
-
20191016_130349.jpg171.7 KB · Views: 337
-
20191016_130403.jpg144.9 KB · Views: 320
-
20191016_130426.jpg158.6 KB · Views: 336
-
20191016_130514.jpg141.2 KB · Views: 382
-
20191016_130523.jpg132.2 KB · Views: 352
-
20191016_130737.jpg164 KB · Views: 374
-
20191016_130342.jpg147.2 KB · Views: 336
-
20191016_130825.jpg146.1 KB · Views: 334
-
20191016_132214.jpg150.2 KB · Views: 319
-
20191016_133554.jpg160.1 KB · Views: 359