Started my bike project (pics)

Started work on the gear box. Two timing gears and belt go inside the box.
Motor connects to the right side with the shaft inside the box as marked. Sheave to wheel sheave on the right. There is a tension wheel that gos next to the 4 in pulley but the hole is not there yet. ;). t-shirt is lining everything up till i get back to the shop. ;) Chain can stay right where it is. Everything clears. :) 74in Drive Belt.


http://members.cox.net/ironwarlock/pics/bike/mm1.jpg
http://members.cox.net/ironwarlock/pics/bike/mm2.jpg
 
All right!
Now we are getting the play by play so some of us underdogs can get the drift!
Thanks
Doc
 
ironwarlock said:
Started the rear drive sheave yesterday. Here it is on the bike. disk brake and fender clear. it will hold 1/2 wide flat belt easy.

Wow, totally cool.
 
Back
Top