Frankenstein
Deceased - Frankenstein 1991 - 2018
- Local time
- 4:56 AM
- Joined
- Jun 24, 2016
- Messages
- 5,035
This is great I'll say that at the least, but the problem is not many people have access to machining equipment or welding equipment at a fair price. I'm fortunate enough to have either the skill or equipment/people available to me who/which can make these simple feats actually simple. This is why people will buy your "product" simply because it's not possible to get them otherwise at a good price if any price (think Joe schmo living in the middle of no where and he's only good at growing vegetables and so is everyone he knows)Here are the drawings, please use them we are here to share and make things CHEAPER ... and we all know cheap is good ...
note the hubclamp is made from PIPE & plate And the inside of that pipe machined to be just a bit bigger then the hub .... note I use 2 m6 nuts between the rear sprocket and that hub bracket for setting the rear sprocket all around the same ... Works perfectly ... It's a pAiN to install though ....
I use 3M tape between all the connection points, strong as bull shat stuff,
Note also that the stock exhaust does not fit with this bracket, so I made a flexible exhaust hose .... The exhaust gasses spray the chain with 2-stroke oil so I do not need to oil my chain any more ....
View attachment 73426 View attachment 73427 View attachment 73428 View attachment 73429
I mean I COULD work up the means to get a set of mounts like yours, heck I don't even need your drawings it's a practical self forwarding idea that I could draw up half drunk in a strip club if I wanted those drawings bad enough, perhaps with a bit more pizazz thrown into it for looks, but I would much rather see you benefit from the idea knowing firmly you know exactly what to do without thinking about it and it will work, and all I have to do is pay you for it. Meanwhile that frees up my strip club/drunk time and I also don't need to aquire the supplies (which would naturally be rigorously researched and over researched for the best materials, and compared over a compiled list consisting of a hundred different values and ultimately wasting even more of my time than necessary, what'd you expect from an engineer otherwise) and whatever else needed to complete the task so that we can all sorta move on with our lives.
Just set a fair but inflated price, this way it's worth doing it even if you hate the idea of doing it for money and rather they do it themselves (which is a concept I completely and totally understand and empathize with, damn stupid people) and if they think the price is too much then they can figure out the rest themselves.