onward and upward,
the UPS man came today 4 clander days ahead of schedual. so i have my clutch drum in the box, the box mounted to the engine, 16T freewheel sprocket on, the first version of the motor mounts built, found wanting and a new one for the box side of the engine in the works.
the new mount will be in the same place and arrangement but instead of being 1x 1-1/2 on edge it's going to be 1x1 like the other side and the 3/8 hole moved to the extreem top and bottom inside walls of the tubes. this will still provide a solid, flat and level arrangement and provide some extra clearancet to get the whole thing down lower. when i get some more pics you'll see why it's important.
no biggy, until you have something solid to work with and evaluate it's hard too see every detail. as it is i was able to atleast get the engine and box in basic position. the whole thing will be moving down at least 2" fom the present pics and possibly back some, i'll have to see after i remount it.
wasn't trying for detail in the pics just some reference shots to show where it's headed.
more later,
steve